B-208
drafting
- General contractor
- Halstead Construction
- Due
- Aug 28
| Room | Material | Layout | Labor | L ft | W ft | Sq ft | Boxes | Total |
|---|---|---|---|---|---|---|---|---|
| 0 | ||||||||
+10% waste = 0 sq ftmaterial $0.00labor $0.00 | ||||||||
0 sq ftAll-in $0.00 / sq ftDeposit $150.00$500.00
| Room | Material | Layout | Labor | L ft | W ft | Sq ft | Boxes | Total |
|---|---|---|---|---|---|---|---|---|
| 0 | ||||||||
+10% waste = 0 sq ftmaterial $0.00labor $0.00 | ||||||||